I'm almost done with the insulation and sheet rock. fired up my wood stove to get some work done today, and when I quit for the night it was up to 67 degrees... not bad considering it was 12 when I started. It takes a while to warm up all that concrete!
The middle section of sheet rock in the photo below is higher than the rest because I misjudged the placement of my radiant heat tubing when we poured the concrete. I had to cut a 1" notch out of the wall at the bottom to miss the tubing. I boxed off the bottom about 8" up from the floor, and started the regular insulation and sheet rock there. Then I cut small pieces and worked in and around the tubing near the floor.
Oh well... once it's taped you'll never know!
_________________
010010010010011101100100001000000111001001100001
011101000110100001100101011100100010000001100010
011001010010000001100110011011000111100101101001
011011100110011100100001