Well the plumbing and electrical sides of the heating system are fully assembled and pressure checked. I've still got to pour the concrete pad for my fuel tank and run the fuel lines, then it's ready for the winter!
Attachments: |
File comment: The burn mark at the top left is from repairing 1 of the 2 leaks I had in the system while pressure testing.
2005_0609_143136AA.JPG [ 34.46 KiB | Viewed 40729 times ]
|
File comment: The 1" supply and return lines run across the wall about 7' high so that they wont interfere with anything I put against the wall.
2005_0609_143156AA.JPG [ 31.34 KiB | Viewed 40729 times ]
|
File comment: Thanks to Mike Betti for telling me about www.radiantec.com, where I puchased this really nice plumbing mechanical package, pump, and pump control relay.
2005_0609_143216AA.JPG [ 37.71 KiB | Viewed 40728 times ]
|
2005_0609_143228AA.JPG [ 34.98 KiB | Viewed 40725 times ]
|
File comment: The burn mark by the control box is from cutting the electric supply wiring with a pair of bolt cutters while it was still energized! Ruined a nice pair of bolt cutters.
2005_0609_143245AA.JPG [ 33.2 KiB | Viewed 40726 times ]
|
_________________
010010010010011101100100001000000111001001100001
011101000110100001100101011100100010000001100010
011001010010000001100110011011000111100101101001
011011100110011100100001