Since the elevator is still on hold I decided to get started on the flaps. Since you have to build two flaps as mirror images, I'm building them both at the same time on opposite sides of the table. This makes the mirror image part really easy.
I put in about 7 hours today and I got one frame riveted, the second needs to be deburred and cleaned, then it's ready to rivet too.
Here are a few pics...
_________________
010010010010011101100100001000000111001001100001
011101000110100001100101011100100010000001100010
011001010010000001100110011011000111100101101001
011011100110011100100001