Well the plumbing and electrical sides of the heating system are fully assembled and pressure checked. I've still got to pour the concrete pad for my fuel tank and run the fuel lines, then it's ready for the winter!
Attachments: |
File comment: The burn mark at the top left is from repairing 1 of the 2 leaks I had in the system while pressure testing.
2005_0609_143136AA.JPG [ 34.46 KiB | Viewed 40712 times ]
|
File comment: The 1" supply and return lines run across the wall about 7' high so that they wont interfere with anything I put against the wall.
2005_0609_143156AA.JPG [ 31.34 KiB | Viewed 40712 times ]
|
File comment: Thanks to Mike Betti for telling me about www.radiantec.com, where I puchased this really nice plumbing mechanical package, pump, and pump control relay.
2005_0609_143216AA.JPG [ 37.71 KiB | Viewed 40711 times ]
|
2005_0609_143228AA.JPG [ 34.98 KiB | Viewed 40708 times ]
|
File comment: The burn mark by the control box is from cutting the electric supply wiring with a pair of bolt cutters while it was still energized! Ruined a nice pair of bolt cutters.
2005_0609_143245AA.JPG [ 33.2 KiB | Viewed 40709 times ]
|