N195AK Construction Log

Photos and commentary from the construction of Murphy Moose #195SR by Mike Davis.
It is currently Sat Nov 23, 2024 12:03 am

All times are UTC - 9 hours [ DST ]


 
 Forum   Topics   Posts   Last post 
No unread posts General Updates

An area where I can make some general updates regarding the overall construction process.

6

6

Wed Apr 15, 2009 8:35 am

mikefairbanks View the latest post

No unread posts Work Shop

The first step in this project was to build a suitable workshop. This is still a work in progress, but coming along nicely.

10

11

Sat Jan 25, 2014 11:46 am

mikefairbanks View the latest post

No unread posts Horizontal Stabilizer

This is the first component that you build. It took me 54.8 hours to build the stab. There is a modification that needs to be done to the h-stab due to some cracks appearing on some aircraft. I am working on this modification at this time.

12

12

Sat Feb 26, 2005 8:30 pm

mikefairbanks View the latest post

No unread posts Rudder

The rudder is complete. It took me 26.1 hours to build the rudder.

4

4

Sat Nov 27, 2004 10:01 pm

mikefairbanks View the latest post

No unread posts Elevator

The elevator is currently on hold.

3

3

Wed Jan 26, 2005 10:19 pm

mikefairbanks View the latest post

No unread posts Flaps

The flaps are currently on hold.

2

2

Sun Jan 23, 2005 9:05 pm

mikefairbanks View the latest post

No unread posts Ailerons

The ailerons are complete. It took me 42.5 hours to build two ailerons. The center hinge bushings will not be installed until the ailerons are fit to the wings... so there is still one more thing to be done later on.

8

8

Tue Feb 08, 2005 4:49 pm

mikefairbanks View the latest post