N195AK Construction Log

Photos and commentary from the construction of Murphy Moose #195SR by Mike Davis.
It is currently Tue Apr 23, 2024 2:32 pm

All times are UTC - 9 hours [ DST ]




Post new topic Reply to topic  [ 1 post ] 
Author Message
PostPosted: Mon Jan 24, 2005 10:04 pm 
Offline
Site Admin
User avatar

Joined: Fri Oct 15, 2004 6:27 pm
Posts: 112
Location: Fairbanks, Alaska
Well I got one frame completed today, and a lot of the tedius stuff finished for the other frame. Basically, whenever the plans call for any sort of fabrication, I went ahead and make the parts for the second aileron at the same time... but I still need to put it all together, drill to the correct size, and debur before assembly.

Some of the fabrication looks much easier than it is... time wise anyway. Nothing has proven to be very difficult, but it's easy to put more time into something than you thought you would. 4 little spacers that needed to be made today are a perfect example. The instructions tell you simply to make four 5/16" spacers from raw stock provided. The raw stock is a piece of aluminum tubing about 2" long. Sounds easy enough doesn't it? Well, I happened to be waiting to make a run to town with my wife and didn't want to start anything else anyway... so I cut 4 pieces slightly longer than necessary on the band saw, then sat down with a file and calipers. 45 minutes later I have 4 spaces all trued to within 1/1000th of an inch of 5/16". Of course if I spent this much time on each step, I'd die of old age before I flew this plane! :lol:

Here are a few photos showing the frame, and a few of the doublers installed on the nose ribs... note that some rivets are flush for clearance. I've also included a photo of my near perfect 5/16" spacers.


Attachments:
File comment: Here's how I get a nice 1" hole perfectly centered on the tooling hole.
2005_0124_113721AA.JPG
2005_0124_113721AA.JPG [ 42.28 KiB | Viewed 25920 times ]
File comment: The 1/4" hole at the top back against the spar is where the control rod will be connected, so the 5 rivets on the top are flush to provide clearance.
2005_0124_202333AA.JPG
2005_0124_202333AA.JPG [ 48.47 KiB | Viewed 25919 times ]
File comment: Here's a rib before being attached, I mark the holes that are to be counter sunk so I'm sure to get the right ones on each piece.
2005_0124_202356AA.JPG
2005_0124_202356AA.JPG [ 36.94 KiB | Viewed 25920 times ]
File comment: One frame all riveted together, the other well on it's way.
2005_0124_202411AA.JPG
2005_0124_202411AA.JPG [ 46.97 KiB | Viewed 25919 times ]
File comment: Four 5/16" spacers in a little under an hour... I probably could have driven to Home Depot and bought some in less time!
2005_0124_202506AA.JPG
2005_0124_202506AA.JPG [ 36.5 KiB | Viewed 25919 times ]

_________________
Image
010010010010011101100100001000000111001001100001
011101000110100001100101011100100010000001100010
011001010010000001100110011011000111100101101001
011011100110011100100001
Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 9 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group